The bathroom is an area with specific conditions: high humidity, temperature differences. That’s why making fixes in the restroom, you need to definitely plan the entire operating process, to consider the sequence of measures to be performed. In this report, you will find out where to begin the repair in the restroom and what sorts of work should be performed with your own hands. Step-by-step instructions for bathroom repair
Stage 1: drawing up a strategy and deciding upon a layout solution.
Fix in the bathroom can be of 2 types:
Begin repairs in the toilet is to ascertain the plan, interior. Think through to the last detail, what’s going to be the room, choose a colour. Pastel colors are traditional, as well as a mix of blue and blue, or peach with beige vsyakuhnya.ru.
Begin repairs in the bathroom is to ascertain the design, interior design. Think in detail, what will be the room, pick a colour. Pastel colors are deemed traditional, in addition to a combination of colors.
The next point is that the option of facing material. Usually, finishing at the toilet is performed with tile, porcelain tiles, mosaicand plastic panels. Check the pipes, whether it needs to be replaced. If needed, choose the right option. Proceed to the measuring function: step all sides, calculate the area of the room. Based on these data, we indicate the location of the plumbing fittings.
Step 2: the selection of sanitary fixtures and substance for completing.
It’s crucial to recognize that the purchase of sanitary ware precedes the planning stage, and not vice versa. This usually means that first we develop a new design project, create a plan, then go to the shop. Yet another point – you need to specify the size of your favorite plumbing fixtures and inspect the plan, whether it matches.
It is very important to see that the purchase of plumbing fixtures is preceded by a preparation stage, rather than vice versa. This usually means that first we develop a design project, make a plan, then go to the store. Another one
In terms of stuff for completing, it’s better to buy them immediately for the whole repair cycle, in order that you will not be diverted if something was missing. Do not forget about preparing the essential tools.
Measure 3: dismantling tiling and plumbing.
After All of the preliminary work is completed, move on to the Start of the work process:
Measure 4: Cost of communications: plumbing, electrical wiring.
Very often in an old house, you should carefully inspect and replace not just the pipes that are in the bathroom itself, but also the most important riser, and on occasion the interfloor plumbing. What’s it worth doing this? Old pipes anytime can give a leak, and then the new repair will be spoiled, it is going to call for extra investment to get rid of flaws.
Posteado en: renovation
slot deposit dana bonus slot slot bonus new member live draw sgp daftar togel online syair hk pornone lk21 doolix terbit21 lk21 dunia21 serbubet desa88 puja88 jalatogel jaringtoto visitogel jangkartoto saldobet